Cold Gas Facility Upgrade
Fabrication and construction for installation of cold gas separators and heat exchangers for South Louisian midstream client.
Man Hours: 20,000 Duration: 4 Months
Corrosion Field Maintenance
Installed cathodic protection cathodes and anodes to update current system and performed maintenance coatings to areas of coating failure and rust break out on upon completion of cathodic protection system update.
Duration: 2 Months
Decommissioning
Provided plug and abandonment campaign support for Gulf of Mexico facility.
Man hours: 135,000 Duration: 24 months
Download the full project sheet
Decommissioning
Provided plug and abandonment campaign support for Gulf of Mexico major operator.
Duration: 36 months
Ethane Booster Station
Onshore installation of three new ethane booster pump stations and one new metering station with launcher / receiver package for South Texas midstream client.
Man hours: 50,000 Duration: 7 Months
Major Facility Control System Expansion
Onshore operations
Automation systems integration - design, fabrication, integraiton, installation and commissioning of new plan control system equipment
Duration: 2 weeks
New Ethane Booster Station
Installation of two 400HP pumps and power distribution center building. Provided associated civil work, fabrication, piping installation, electrical hook up and final commissioning. South Louisiana midstream client
Man hours: 20,000 Duration: 4 Months
New Facility Rail to Pipeline
New facility Instrumentation and electrical
South Louisiana midstream client
Project management, pre-commissioning, commissioning and complete instrumentation and electrical installation, MV, LV, PLC and communications
Duration: 13 months
PSV Modification
Assembled and erected a new 110' vent stack, power and controls to CO2 snuffing system unit for North Carolina midstream client.
Man hours: 23,000 Duration: 5 months
Solar Farm Maintenance
Reattached cable ties on facility.
Duration: 2 weeks
Natural Gas Production Processing Plant Turnaround
Danos’ Project Management team assisted client from beginning to end of their turnaround: from identifying and planning the work to training and mobilizing the workforce to safely brining the plant back online. Services provided: Project Management, Construction, Instrumentation & Electrical
Duration: 30 days Manpower: 102
Nature-based Pipeline Protection
Installation of Natrx's Cajun Coral for pipeline infrastructure protection & resilience.
Download the full project sheet.
Island Road Marsh Stabilization
Installation of Cajun Coral and Oysterbreak for marsh stabilization and infrastructure protection of the low-lying, at-risk community of Point Aux Chenes.
PIcture Rock Solar
14,000 terminations and cable installation
DEPCOM Solar Farm
Welding inspection
Hunter Solar Farm
Cable re-routing and cable management for 150,000 modules
Avalon 2 Solar Farm
Cable re-routing and maintenance
Taygete 1 Solar Farm
Cable re-routing and cable management for 700,000 modules
Buckhorn Solar Farm
Module removal and replacement
Danos Reveals Artificial Reef in Timbalier Bay
Danos completed the installation of a new artificial reef in Timbalier Bay, LA. The objective is to revive the current fish population, benefiting local recreational anglers. This collaborative project was made possible through the support of Chevron, Natrx and the Coastal Conservation Association (CCA).
Hotel Sid
Danos installed site-specific Cajun Coral to restore vital marine habitat and recreational fishing environment near Grand Isle, La. The installation replaced a lost marine habitat with a vibrant, sustainable habitat that will serve both marine life and anglers for generations to come.