Project Portfolio

Cold Gas Facility Upgrade

Cold Gas Facility Upgrade


Fabrication and construction for installation of cold gas separators and heat exchangers for South Louisian midstream client.

Man Hours: 20,000   Duration: 4 Months

Cold Gas Facility Upgrade
Corrosion Field Maintenance

Corrosion Field Maintenance


PERMIAN BASIN MAJOR OPERATOR

Installed cathodic protection cathodes and anodes to update current system and performed maintenance coatings to areas of coating failure and rust break out on upon completion of cathodic protection system update.

Duration: 2 Months

Decommissioning

Decommissioning


Provided plug and abandonment campaign support for Gulf of Mexico facility.

Man hours: 135,000     Duration: 24 months

Download the full project sheet

Decommissioning
Decommissioning

Decommissioning


Provided plug and abandonment campaign support for Gulf of Mexico major operator.

Duration: 36 months

Download the full project sheet.

Ethane Booster Station

Ethane Booster Station


Onshore installation of three new ethane booster pump stations and one new metering station with launcher / receiver package for South Texas midstream client.

Man hours: 50,000   Duration: 7 Months

Download the full project sheet.

Major Facility Control System Expansion

Major Facility Control System Expansion


Onshore operations

Automation systems integration - design, fabrication, integraiton, installation and commissioning of new plan control system equipment

Duration: 2 weeks

Download the project sheet.

New Ethane Booster Station

New Ethane Booster Station


Installation of two 400HP pumps and power distribution center building. Provided associated civil work, fabrication, piping installation, electrical hook up and final commissioning. South Louisiana midstream client

Man hours: 20,000     Duration: 4 Months

Download the full project sheet.

New Facility Rail to Pipeline

New Facility Rail to Pipeline


New facility Instrumentation and electrical

South Louisiana midstream client

Project management, pre-commissioning, commissioning and complete instrumentation and electrical installation, MV, LV, PLC and communications

Duration: 13 months

Download the full project sheet.

PSV Modification

PSV Modification


Assembled and erected a new 110' vent stack, power and controls to CO2 snuffing system unit for North Carolina midstream client.

Man hours: 23,000    Duration: 5 months

Download the full project sheet.

Solar Farm Maintenance

Solar Farm Maintenance


Reattached cable ties on facility.

Duration: 2 weeks

Download the full project sheet.

Natural Gas Production Processing Plant Turnaround

Natural Gas Production Processing Plant Turnaround


Danos’ Project Management team assisted client from beginning to end of their turnaround: from identifying and planning the work to training and mobilizing the workforce to safely brining the plant back online. Services provided: Project Management, Construction, Instrumentation & Electrical

Duration: 30 days     Manpower: 102

Download the project sheet.

Nature-based Pipeline Protection

Nature-based Pipeline Protection


Installation of Natrx's Cajun Coral for pipeline infrastructure protection & resilience.

Download the full project sheet.

Nature-based Pipeline Protection
Island Road Marsh Stabilization

Island Road Marsh Stabilization


Installation of Cajun Coral and Oysterbreak for marsh stabilization and infrastructure protection of the low-lying, at-risk community of Point Aux Chenes.

Download the full project sheet.

PIcture Rock Solar

PIcture Rock Solar


14,000 terminations and cable installation

DEPCOM Solar Farm

DEPCOM Solar Farm


Welding inspection

Hunter Solar Farm

Hunter Solar Farm


Cable re-routing and cable management for 150,000 modules

Avalon 2 Solar Farm

Avalon 2 Solar Farm


Cable re-routing and maintenance

Taygete 1 Solar Farm

Taygete 1 Solar Farm


Cable re-routing and cable management for 700,000 modules

Buckhorn Solar Farm

Buckhorn Solar Farm


Module removal and replacement

Danos Reveals Artificial Reef in Timbalier Bay

Danos Reveals Artificial Reef in Timbalier Bay


Danos completed the installation of a new artificial reef in Timbalier Bay, LA. The objective is to revive the current fish population, benefiting local recreational anglers. This collaborative project was made possible through the support of Chevron, Natrx and the Coastal Conservation Association (CCA).

Download the full project sheet.

Click here to view the photos.

Hotel Sid

Hotel Sid


Danos installed site-specific Cajun Coral to restore vital marine habitat and recreational fishing environment near Grand Isle, La. The installation replaced a lost marine habitat with a vibrant, sustainable habitat that will serve both marine life and anglers for generations to come.

Download the full project sheet.

Danos Foundation
The Danos Foundation impacts and improves the communities where we live and work by mirroring the Purpose and Values of Danos. Within the guidelines of the Foundation’s Purpose and Values, we leverage our resources of time, talent and money to support and promote involvement in activities and initiatives to help resolve community challenges and make a difference in the lives of people.